Selection rules of whole comprehensive water processor
    The comprehensive water processor is a kind of comprehensive water treatment equipment aiming at the single function of industrial and civil circulating water treatment equipment. This set of equipment, anti fouling, anti rust rust biocide and super purification functions, can solve the pipeline, effective heat transfer equipment corrosion, fouling, bacteria and algae breeding, breeding sludge and other issues, to avoid the problem of water system installation of single equipment with single function, all high installation cost, waste of space resources etc..
    Selection principle:
    1 according to the water system installation site diameter to choose, such as water system diameter 200mm, can choose inlet and outlet pipe diameter of 200mm equipment.
    2) the water content profile parameters in the table for processing flow range, if the selection according to the treatment amount, should take the average maximum and minimum throughput value, so as to avoid the increase of local resistance due to the pipe diameter and the inlet and outlet system of different caliber equipment.
    3) equipment pressure, temperature, structural form, depending on the actual situation of the system selected, the system should be treated pressure, temperature should take the maximum value.
    Installation form and location:
    1) principle: "the whole integrated water processor" should be installed on the water inlet pipe, filter adsorption impurities.   Control of water quality.
    2) independent principle: "integrated water processor" in principle each independent system should be installed separately. Such as: refrigeration, cooling circulating water system, should be installed in the backwater or water supply pipeline.
    3) equipment should be installed in the water system of the lowest or return pipe (circulatory system). Installed system operating pressure should be greater than 0.25MPa to meet the needs of sewage.
    4) shall be installed in a by-pass form for blowdown and maintenance.